The Future in a Construction. WorldWide.

1993

4.1 Municipality of Sezze

Year: 1993

Job order reference: 4.1

Client: Municipality of Sezze

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Concession for the Operation and Maintenancr of the municipal services related to the water cycle

3.121 Comune di Storo

Year: 1993

Job order reference: 3.121

Client: Comune di Storo

Contractor: COSTRUZIONI S.p.A.

Category: Integrated Water Cycle

Description: Transitory Operation and Maintenance of the mechanical treatment plant on adduction manifold in industrial area of Storo

3.117 Municipality of Cecina

Year: 1993

Job order reference: 3.117

Client: Municipality of Cecina

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Operation and Maintenance of the centralized sewage treatment plant of sewers waters

3.116 Municipality of Codevigo

Year: 1993

Job order reference: 3.116

Client: Municipality of Codevigo

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Tecnical Operation and Maintenace of the Imhoff Tanks and pumping station of the municipal drainage system

3.115 Municipality of Carmignano di Brenta

Year: 1993

Job order reference: 3.115

Client: Municipality of Carmignano di Brenta

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Operation and Maintenance of the municipal sewage treatment plant

1.633 Municipality of Aidoscina

Year: 1993

Job order reference: 1.633

Client: Municipality of Aidoscina

Contractor: COSTRUZIONI DONDI S.p.A.

Category: GAS Networks

Description: Construction works of the methane gas distribution - Municipality of Aidoscina

1.632 Municipality of Lasko

Year: 1993

Job order reference: 1.632

Client: Municipality of Lasko

Contractor: COSTRUZIONI DONDI S.p.A.

Category: GAS Networks

Description: Construction works of the methane gas distribution network - Municipality of Lasko

1.602 Municipality of Radece

Year: 1993

Job order reference: 1.602

Client: Municipality of Radece

Contractor: COSTRUZIONI DONDI S.p.A.

Category: GAS Networks

Description: Construction works of the methane gas network of Radece

1.599 Municipality of Sermoneta

Year: 1993

Job order reference: 1.599

Client: Municipality of Sermoneta

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Construction works of the sewage network at the service of the historical center of Sermoneta, Monticchio and Pontenuovo

1.597 Consorzio Basso Livenza

Year: 1993

Job order reference: 1.597

Client: Consorzio Basso Livenza

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Final works of the water mains of Basso Livenza - XV Executive phase - Construction of the pumping station of Lison - Electromechanical and hydraulic works

1.595 S.I.C.I.P. Carbonia

Year: 1993

Job order reference: 1.595

Client: S.I.C.I.P. Carbonia

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Construction works of the biological sewage treatment plant of Portovesme industrial area and in the residential area of Portoscuso (CA)

1.594 Municipality of Villadose

Year: 1993

Job order reference: 1.594

Client: Municipality of Villadose

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Other Works

Description: Construction works of two bridges

1.593 Municipality of Genova

Year: 1993

Job order reference: 1.593

Client: Municipality of Genova

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Urgent works on the pretreatment and the emergency pumping station of the sewage treatment plant of Pegli

1.591 PAT - Trento

Year: 1993

Job order reference: 1.591

Client: PAT - Trento

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Rehabilitation and extension works of the sewage treatment plant of Trento Nord

1.590 Consorzio Pozzuolo del Friuli

Year: 1993

Job order reference: 1.590

Client: Consorzio Pozzuolo del Friuli

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Construction works of the sewage treatment plant

1.588 I.S.I. S.p.A.

Year: 1993

Job order reference: 1.588

Client: I.S.I. S.p.A.

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Other Works

Description: Environmental remediation of ex sugar factory ,Porto Tolle (RO)

1.587 CONSIAG

Year: 1993

Job order reference: 1.587

Client: CONSIAG

Contractor: COSTRUZIONI DONDI S.p.A.

Category: GAS Networks

Description: Final works of the gas distribution network and the replacement works of the water supply network in Seano, Municipality of Carmignano

1.586 CONSIAG

Year: 1993

Job order reference: 1.586

Client: CONSIAG

Contractor: COSTRUZIONI DONDI S.p.A.

Category: GAS Networks

Description: Construction work of the methane gas distribution network and replacement works of the water supply network in Comeana, Municipality of Carmignano

1.634 Municipality of Izlace

Year: 1993

Job order reference: 1.634

Client: Municipality of Izlace

Contractor: COSTRUZIONI DONDI S.p.A.

Category: GAS Networks

Description: Construction works of the methane gas distribution network - Municipality of Izlace

1.585 CONSIAG

Year: 1993

Job order reference: 1.585

Client: CONSIAG

Contractor: COSTRUZIONI DONDI S.p.A.

Category: GAS Networks

Description: Construction work of the methane gas distribution network and replacement works of the water supply network of La Serra and Santa Cristina a Mezzana in Municipality of Carmignano - I phase

1.584 Slovenski Plinovodi d.o.o.

Year: 1993

Job order reference: 1.584

Client: Slovenski Plinovodi d.o.o.

Contractor: COSTRUZIONI DONDI S.p.A.

Category: GAS Networks

Description: Construction works for the natural-gas distribution network with all the structure in Lasko, Celje, Zalec, Sentjur and Zagorje

1.582 LENDIFIN S.r.l.

Year: 1993

Job order reference: 1.582

Client: LENDIFIN S.r.l.

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Environmental remediation works in the industrial area "Le Valli" with toxic waste disposal

1.578 Sviluppo Agricolo Umbria

Year: 1993

Job order reference: 1.578

Client: Sviluppo Agricolo Umbria

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Construction works of primary and secondary irrigation pipes network , construction of new areas, adjustment of various works on Niccone creek

1.577 PAT - Trento

Year: 1993

Job order reference: 1.577

Client: PAT - Trento

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Technological Adjustment works for the remote control of the sewage treatment plant of "Fai della Paganella"

1.573 A.C.E.A.

Year: 1993

Job order reference: 1.573

Client: A.C.E.A.

Contractor: Joint Venture COSTRUZIONI DONDI S.p.A. (leader) and partners

Category: Integrated Water Cycle

Description: Renovation works, remote control and remote control prearrangement of the pumping station located on the final supply section of the sewage treatment plant of Roma-Nord and Roma-Ostia and related connected pipes