The Future in a Construction. WorldWide.

2012

1.783 S.C.Apa C.T.T.A. S.A. ALBA

Year: 2012

Job order reference: 1.783

Client: S.C.Apa C.T.T.A. S.A. ALBA

Contractor: Joint Venture COSTRUZIONI DONDI S.p.A. (leader) and partners

Category: Integrated Water Cycle

Description: Design and built of the extension of the existing potable drinking plants in the cites of Sebes, Petresti, Cugir and of the new waste water treatment plant in Sebes and Campeni - Romania

1.782 ABBANOA S.p.A.

Year: 2012

Job order reference: 1.782

Client: ABBANOA S.p.A.

Contractor: Joint Venture COSTRUZIONI DONDI S.p.A. (leader) and partners

Category: Integrated Water Cycle

Description: Design and built of the new potable water treatment plant of Villagrande Strisaili (OG)