1985

3.73 PAT - Indipendent Province of Trento

Year: 1985

Job order reference: 3.73

Client: PAT - Indipendent Province of Trento

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Operation and Maintenance of the sewage treatment plant and the main flue in Avisio Valley area

3.67 Municipality of Contarina

Year: 1985

Job order reference: 3.67

Client: Municipality of Contarina

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Tecnical Operation and Maintenance of the sewage treatment palnt

1.474 Municipality of Montepulciano

Year: 1985

Job order reference: 1.474

Client: Municipality of Montepulciano

Contractor: Joint Venture COSTRUZIONI DONDI S.p.A. (leader) and partners

Category: GAS Networks

Description: Construction works of the natural-gas distribution plant

1.447 A.M.A.G.Padova

Year: 1985

Job order reference: 1.447

Client: A.M.A.G.Padova

Contractor: COSTRUZIONI DONDI S.p.A.

Category: GAS Networks

Description: Construction works of the gas pipeline and M.P. network in Grange street and Olanda street - Padova

1.445 Consorzio Acquedotto Alto Polesine

Year: 1985

Job order reference: 1.445

Client: Consorzio Acquedotto Alto Polesine

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: "General plannings works of the automation plant and control of the Consortium network and the consecutive planning and fulfillment of the first executive phase of the design"

1.443 Consorzio Acquedotto Tergola

Year: 1985

Job order reference: 1.443

Client: Consorzio Acquedotto Tergola

Contractor: Joint Venture COSTRUZIONI DONDI S.p.A. (leader) and partners

Category: Integrated Water Cycle

Description: Hydric connection line works, small conduit, ordinary and extra maintenance works to do occasionally in Consortium for one year period

1.442 Ass. Intercomunale Valdichiana

Year: 1985

Job order reference: 1.442

Client: Ass. Intercomunale Valdichiana

Contractor: COSTRUZIONI DONDI S.p.A.

Category: GAS Networks

Description: Construction works of the municipal methane gas distribution network of Cetona

1.439 Consorzio Acquedotto Tergola

Year: 1985

Job order reference: 1.439

Client: Consorzio Acquedotto Tergola

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Construction works of the sewer network from Curtarolo to Vigodarzere - IV phase

1.438 Municipality of Carrara Santo Stefano

Year: 1985

Job order reference: 1.438

Client: Municipality of Carrara Santo Stefano

Contractor: COSTRUZIONI DONDI S.p.A.

Category: GAS Networks

Description: Construction works of the methane gas distribution network

1.437 Municipality of Pernumia

Year: 1985

Job order reference: 1.437

Client: Municipality of Pernumia

Contractor: COSTRUZIONI DONDI S.p.A.

Category: GAS Networks

Description: Construction works of the methane gas distribution network - Municipality of Pernumia

1.436 Municipality of Arqua Petrarca

Year: 1985

Job order reference: 1.436

Client: Municipality of Arqua Petrarca

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Construction works of the municipal sewer - III phase

1.435 Municipality of Rovigo

Year: 1985

Job order reference: 1.435

Client: Municipality of Rovigo

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Final works with set up mechanical devices at the sewage treatment plant - Belfiore

1.434 Municipality of Casalpusterlengo

Year: 1985

Job order reference: 1.434

Client: Municipality of Casalpusterlengo

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Construction works of the sewage treatment plant - II phase

1.433 Consorzio Acquedotto Alto Polesine

Year: 1985

Job order reference: 1.433

Client: Consorzio Acquedotto Alto Polesine

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Supply and setup works of conduit of Lendinara - Bornio

1.432 Municipality of Mezzolombardo

Year: 1985

Job order reference: 1.432

Client: Municipality of Mezzolombardo

Contractor: COSTRUZIONI DONDI S.p.A.

Category: GAS Networks

Description: Construction works of the methane gas distribution network - I phase

1.431 Consorzio Acquedotto Alto Polesine

Year: 1985

Job order reference: 1.431

Client: Consorzio Acquedotto Alto Polesine

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Construction works two filters units - 4th filtration line of the water treatment plant - Electromechanical devices

1.430 Municipality of Pomezia

Year: 1985

Job order reference: 1.430

Client: Municipality of Pomezia

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Final works of the water treatment plant of Pomezia - Supply and installation of emergency groups generators and computers

1.428 Consorzio Acquedotto Tergola

Year: 1985

Job order reference: 1.428

Client: Consorzio Acquedotto Tergola

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Supplying for the electromechanical works of the sewage treatment plant of Vigonza - Project drainage system III phase

1.427 Municipality of Vigonovo

Year: 1985

Job order reference: 1.427

Client: Municipality of Vigonovo

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Other Works

Description: Construction works of four classrooms and building extension of the secondary public school of Vigonovo (VE)

1.424 Municipality of Trento

Year: 1985

Job order reference: 1.424

Client: Municipality of Trento

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Development works of the sewage treatment plant of Trento - South - I phase

1.373 Municipality of Campobasso

Year: 1985

Job order reference: 1.373

Client: Municipality of Campobasso

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Construction works of the sewage treatment plant of "Scarfone e S. Pietro" district - I phase

1.421 Municipality of Galatina

Year: 1985

Job order reference: 1.421

Client: Municipality of Galatina

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

1.425 Consortium for Urban solid waste distribution - Municipality of San Bonifacio (VR)

Year: 1985

Job order reference: 1.425

Client: Consortium for Urban solid waste distribution - Municipality of San Bonifacio (VR)

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Construction works of the new waste disposal plant R.S.U.

1.429 Municipality of Trento

Year: 1985

Job order reference: 1.429

Client: Municipality of Trento

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Rehabilitation works of the biological system in "Pianezza" C.C. Cles (TN)

1.440 Municipality of Felonica

Year: 1985

Job order reference: 1.440

Client: Municipality of Felonica

Contractor: COSTRUZIONI DONDI S.p.A.

Category: GAS Networks

Description: 1 - Construction works of the methane gas distribution network - I phase - Moglia - Caposotto 2 - Construction works of the methane gas distribution network - II phase - Caposotto - Le Lame 3 - Construction works of the methane gas distribution network - III phase - Le Lame - Felonica