The Future in a Construction. WorldWide.

2008

3.179 Municipality of Treviso

Year: 2008

Job order reference: 3.179

Client: Municipality of Treviso

Contractor: COSTRUZIONI DONDI S.p.A. - ACEGAS S.p.A. - CST S.r.l.

Category: Integrated Water Cycle

Description: Tecnical Operation and Maintenance of the municipal sewage treatment plant and pumping station of the drainage system of Treviso

1.764 C.C.C. S.p.A.

Year: 2008

Job order reference: 1.764

Client: C.C.C. S.p.A.

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Design and construction works of the remote control of the vacuum sewer, electromechanical works and technical assistance for the final testing

1.763 Acquedotto Pugliese S.p.A.

Year: 2008

Job order reference: 1.763

Client: Acquedotto Pugliese S.p.A.

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Rehabilitation work of the final delivery section of the treatment plant serving the Municipality of Collepasso (LE)

1.762 Municipality of Ploiesti - Romania -

Year: 2008

Job order reference: 1.762

Client: Municipality of Ploiesti - Romania -

Contractor: COSTRUZIONI DONDI S.p.A.

Category: Integrated Water Cycle

Description: Design and construction works for the sewage treatment plant modernization of Ploiesti

1.759 Provveditorato OO.PP. - Campania / Molise

Year: 2008

Job order reference: 1.759

Client: Provveditorato Interregionale OO.PP. - Campania / Molise

Contractor: Joint Venture COSTRUZIONI DONDI S.p.A. (leader) and partners

Category: Integrated Water Cycle

Description: Completion work of the sewage system - Municipality of Striano (NA)

1.757 Ac RilaGas

Year: 2008

Job order reference: 1.757 Ac

Client: RilaGas

Contractor: COSTRUZIONI DONDI S.p.A.

Category: GAS Networks

Description: Contract for the realization of medium and low pressure distribution network between 16 and 0.5 bar of Blagoevgrad - Bulgaria - I phase

1.755 Consorzio Bonifica Vulture - Alto Brandano

Year: 2008

Job order reference: 1.755

Client: Consorzio Bonifica Vulture - Alto Brandano

Contractor: Joint Venture COSTRUZIONI DONDI S.p.A. (leader) and partners

Category: Integrated Water Cycle

Description: Development and improvement works of Santa Venere adjustment capabilities with restructuring of the derivation works and transfer to the diversion chamber